Case Study · Power Apps

Power Apps Scheduling System Case Study: How Ceva Safety Brought Hundreds of Property Visits into One System

Ceva Safety replaced spreadsheet-based scheduling with a Power Apps and SharePoint system that tracks visits across hundreds of properties, alerts the team when one is due, and keeps every report linked to the order it belongs to.

Safety services business using a Power Apps scheduling system to manage property visits and reports

Hundreds of properties, one system

Automated alerts when visits due

Reports linked to every order

Executive summary

Ceva Safety carries out scheduled visits across hundreds of properties, each producing a report that has to be created, stored and kept current. The work itself was well understood, but there was no single system to schedule it, track it and hold the resulting reports together.

Inteknix began with a discovery phase, working directly with the directors to map how orders were scheduled, carried out and recorded. The resulting solution, built on Power Apps and SharePoint, holds clients, properties and orders in one place, shows scheduled visits on a calendar, raises alerts when a visit is due or a report is outstanding, and stores every report against the order it belongs to. Because it uses the Microsoft tools Ceva Safety already had, it required no additional licensing.

At a glance

Bullet markers in the Why Inteknix list
Client: Ceva Safety
Bullet markers in the Why Inteknix list
Sector: Compliance and risk management
Bullet markers in the Why Inteknix list
Challenge: Visit scheduling across hundreds of properties tracked in spreadsheets, with reports held separately
Bullet markers in the Why Inteknix list
Solution: Power Apps and SharePoint order scheduling system with automated alerts and linked report storage
Bullet markers in the Why Inteknix list
Result: One system for clients, properties, orders and reports, delivered within existing Microsoft 365 licensing

About the Client

Ceva Safety provides safety services across a portfolio of hundreds of properties, carrying out scheduled visits and producing the reports that evidence them.

Services used:

Power Apps

SharePoint Online

Workflow Automation

The challenge

Ceva Safety's scheduling had been managed in spreadsheets, which had worked while the portfolio was smaller. At hundreds of properties, each with its own visit frequency and its own reporting history, the spreadsheet had reached the limits of what it could sensibly do. This caused:

Bullet markers in the Why Inteknix list

No single view of the schedule, so the current position had to be assembled from more than one place

Bullet markers in the Why Inteknix list

No way to track the status of an order from scheduled through to completed

Bullet markers in the Why Inteknix list

No automatic prompt when a visit was approaching or a report had not been returned

Bullet markers in the Why Inteknix list

Reports held separately from the schedule, so finding the history for a property meant looking in two places

Bullet markers in the Why Inteknix list

Repeated manual effort to keep the schedule current, consuming administrative time

The directors wanted one system that could hold the whole picture, scale with the portfolio, and use the Microsoft tools already available to the business.

Blue square with white dots

The approach

The engagement began with a discovery phase rather than a build. Inteknix conducted user research with the directors to understand how orders were actually scheduled and delivered, where time was being lost, and what a workable system would need to do. That produced a documented set of findings, which became the basis for the solution rather than a set of assumptions.

The design used Power Apps and SharePoint, both already available to Ceva Safety, with standard connectors throughout, so the system could be delivered without new licences or subscriptions. Historic schedule information held across multiple spreadsheets was migrated into the new structure, and existing report folders were linked to the orders they related to, so the system launched with the history already in place rather than starting empty.

The solution

One record of clients, properties and orders

Clients, properties and orders are held in a single structured database, with each order linked to the property and client it belongs to. Visit frequencies are defined by order type, so the system knows when each property is next due. Creating a new order for a property that is not yet on the system sets up the client, the property and the supporting folder structure automatically.

Scheduling and calendar visibility

A Power Apps application gives the team one place to manage the schedule. Orders can be created, rescheduled and updated as visits are carried out, and a calendar view shows what is coming up rather than requiring the schedule to be read as a list.

Automated alerts for visits due and overdue

The system raises alerts when a visit is approaching, so scheduling happens ahead of the deadline rather than in response to it. A second alert flags any order whose status has not been updated after the visit date, which surfaces outstanding work without anyone having to check.

An intranet where every report is linked to its order

A SharePoint intranet provides a central home for the business, with report documents held in a structured library and linked to the order they evidence. Looking up a property's history is a single step, and non-report documents have a defined place rather than accumulating alongside them.

The outcome

Ceva Safety now runs its visit schedule from one system. The directors can see what is due, what is in progress and what is outstanding without assembling that picture from spreadsheets, and the reports that evidence each visit sit with the order rather than in a separate structure.

The alerts changed the rhythm of the work. Visits are scheduled because the system flags them, and reports that have not been returned surface on their own rather than being noticed later. That removes a recurring administrative task and the risk that goes with it.

Because the system was built on Microsoft tools the business already held, using standard connectors only, the capability arrived without additional licensing, and the structure supports the portfolio continuing to grow.

Key results

Bullet markers in the Why Inteknix list
Hundreds of properties managed in one system, with clients, properties and orders linked together
Bullet markers in the Why Inteknix list
Historic schedule information consolidated from separate spreadsheets at launch
Bullet markers in the Why Inteknix list
Automated alerts when visits are due and when a report has not been returned
Bullet markers in the Why Inteknix list
Every report linked to its order, so property history is found in one step
Bullet markers in the Why Inteknix list
Calendar view of scheduled visits, replacing list-based tracking
Bullet markers in the Why Inteknix list
Delivered within existing Microsoft 365 licensing, using standard connectors with no new subscriptions

Conclusion

Spreadsheets are often the right tool right up until the point they are not. For Ceva Safety, the tipping point was scale: hundreds of properties, each with its own cycle and its own reporting trail. Moving that into a structured system built on tools the business already owned brought the schedule, the status and the evidence into one place, without the cost or disruption of a new platform.

Selected Work

Explore our recent work

Who We Build For

Who else does Inteknix help with scheduling and order management?

Our scheduling work suits businesses that carry out recurring visits, inspections or services across many sites, and still manage that schedule in spreadsheets.

We often help teams that keep reports and evidence separately from the schedule, and want visits flagged automatically and every document linked to the job it belongs to.

FAQs

Frequently asked questions

Can Power Apps replace a scheduling spreadsheet?

Yes, and it is one of the most common reasons businesses adopt it. A spreadsheet holds the data but cannot track status, enforce structure, or prompt anyone when something is due. Power Apps with SharePoint adds those capabilities while keeping the familiar idea of a single list of work.

How do you manage recurring inspections or visits in a Power Apps system?

Define the visit frequency against the order type rather than the individual record, so the system calculates when each property is next due. Scheduling then follows from the data instead of being maintained by hand, and adding a property inherits the correct cycle automatically.

Can Power Automate send alerts when a scheduled visit is due?

Yes. Scheduled flows can check upcoming visit dates and notify the relevant people ahead of time. The same approach catches the reverse case, flagging any visit whose status has not been updated after the date it was due, which is usually the more valuable of the two.

Store reports in a structured document library and associate each one with its order record, rather than relying on folder names to carry the relationship. Looking up a property then returns both the visit history and the supporting documents together.

How do you migrate historic schedule data from spreadsheets into SharePoint?

Map the spreadsheet columns to the target structure, import in a controlled pass rather than by hand, and link existing document folders to the records they belong to. Launching with history already in place matters, because a system that starts empty tends to be used alongside the old one rather than instead of it.

Does a Power Apps and SharePoint scheduling system need additional licensing?

Not usually. Where the app uses SharePoint and standard connectors, as Ceva Safety’s does, it is covered by the Power Apps capability included with Microsoft 365. Premium connectors, Dataverse, or giving external parties access each change that position, so licensing is worth confirming at design stage rather than after build.

How do you track whether a report has been completed after a visit?

Give the order a status that has to move as the work progresses, then alert on records that have not moved when they should have. This surfaces outstanding work automatically rather than depending on someone noticing a gap.

What does a discovery phase add before building a system like this?

It replaces assumptions with documented findings. Interviewing the people who run the process establishes how the work is actually done, which constraints are real, and what the system has to support on day one. That reduces the risk of building something that fits the brief but not the business.

Brand dot pattern Brand dot pattern Brand dot pattern Brand dot pattern

Looking to achieve similar results?

If your scheduling lives in a spreadsheet that has outgrown the job, a Power Apps and SharePoint system can hold the schedule, the status and the supporting documents in one place.

Practical advice, clear next steps, no obligation