Case Study · Power Apps

How Alpha Engineering got a stalled ERP into production and off its spreadsheets

A Selby precision engineering firm had paid for a Power Platform ERP that never went live. Inteknix completed the unfinished functionality, fixed what was broken, extended the system, and put it into daily use.

Alpha Engineering ERP case study showing a completed Microsoft Power Platform manufacturing system

A stalled ERP finished and live

Bugs fixed, functionality extended

Every phase delivered on time

Executive summary

Alpha Engineering had commissioned an ERP on Microsoft Power Platform from another supplier. The build stalled before completion and never went into service, leaving the firm with a partly built system it could not use and an operation still running on spreadsheets, email and a whiteboard.

Inteknix took the existing build forward rather than starting again. Unfinished functionality was completed, defects were resolved, role-based access problems were corrected, and further functionality was added to cover requirements the original scope had not reached. SharePoint Online was introduced for document handling alongside the existing Dataverse records.

At a glance

Bullet markers in the Why Inteknix list
Client: Alpha Engineering
Bullet markers in the Why Inteknix list
Sector: Engineering and Manufacturing
Bullet markers in the Why Inteknix list
Locations: Selby, United Kingdom
Bullet markers in the Why Inteknix list
Challenge: A part-built Power Platform ERP that had stalled and never gone live
Bullet markers in the Why Inteknix list
Solution: Completion, defect resolution and extension of the existing build, with SharePoint document management added
Bullet markers in the Why Inteknix list
Result: A working ERP in daily use, with every phase delivered on schedule

About the Client

Alpha Engineering is a precision engineering firm based in Selby, North Yorkshire, operating a workshop that takes jobs from customer enquiry through machining to delivery.

Services used:

Microsoft Power Platform

Governance and Permissions

The challenge

Alpha Engineering's operational data was spread across spreadsheets, email threads and a whiteboard. Quotes, jobs and accounts were tracked manually, and workshop scheduling depended on conversations rather than a shared system.

The firm had already acted on this. An ERP had been commissioned on Microsoft Power Platform from another supplier, but the build stalled before it was finished. It carried unresolved defects, functionality that had been started and not completed, and problems with role-based access that meant it could not safely be rolled out. It never went into service.

That left Alpha Engineering in a difficult position:

Bullet markers in the Why Inteknix list

Manual processes still running, unchanged, across spreadsheets and email

Bullet markers in the Why Inteknix list

A significant investment made in a system nobody could use

Bullet markers in the Why Inteknix list

Unfinished functionality and open defects in the existing build

Bullet markers in the Why Inteknix list

Access permissions that were not fit to release to staff

Bullet markers in the Why Inteknix list

No clear route to getting the system into production

The question was not whether Power Platform was the right choice — that decision had already been made and the build existed. The question was whether the work already done could be salvaged, or whether the investment was lost.

Blue square with white dots

The approach

Inteknix assessed the existing build before proposing anything. The finding was that the foundation was sound enough to take forward, and that completing it would cost Alpha Engineering considerably less than starting over.

Work then ran in phases, each agreed and scheduled with Alpha Engineering, so the firm could see progress against a system that had previously produced none. Defects and access problems were addressed first, since neither completed nor new functionality could be released while the system could not safely be put in front of staff.

The solution

Completing the unfinished build

Functionality that had been started but not finished was completed and brought into working order, and outstanding defects across the existing build were resolved.

Corrected role-based access

Problems with role-based access control were fixed, so permissions behave predictably and the system could be released to staff with confidence about who can see and do what.

Extended functionality

Further functionality was designed and built beyond the original scope, covering requirements the initial project had not reached.

SharePoint document management

SharePoint Online was introduced to handle documents within several areas of the system, so files sit alongside the Dataverse records they relate to and are reached through the job rather than searched for separately.

Phased delivery

Each phase was scoped, agreed and delivered to the date set with Alpha Engineering, giving the firm a predictable sequence of working releases after a project that had previously delivered none.

The outcome

Alpha Engineering has a working ERP in daily use. The investment in the original build was recovered rather than written off, and the system now does more than the project it replaced was scoped to do.

The move off spreadsheets and manual tracking has happened, several years after the firm first set out to make it.

Key results

Bullet markers in the Why Inteknix list
Took a stalled ERP into production, after it had failed to go live
Bullet markers in the Why Inteknix list
Completed unfinished functionality and resolved outstanding defects
Bullet markers in the Why Inteknix list
Fixed role-based access problems that had blocked release to staff
Bullet markers in the Why Inteknix list
Extended the system beyond its original scope
Bullet markers in the Why Inteknix list
Introduced SharePoint document management alongside the existing Dataverse records
Bullet markers in the Why Inteknix list
Delivered every phase on the agreed timeline
Bullet markers in the Why Inteknix list
Recovered the client's original investment rather than rebuilding from scratch
quote

“Inteknix have been a great help in supporting us on a technical Power Apps and SharePoint project. Highly recommended.”

Justin Arthur, Director, Alpha Engineering

Conclusion

Stalled system projects are common and rarely discussed. The reflexive response is to write off the work and start again, which is expensive and not always necessary. Assessing what exists before deciding meant Alpha Engineering kept the value of its original investment and got a working system, rather than paying twice for the same outcome.

Selected Work

Explore our recent work

Who We Build For

Who else does Inteknix help with stalled Power Platform projects?

Our project recovery work suits organisations that have invested in a business system that stalled or never went live, and want to know what can be salvaged before starting again.

We often help firms still running quotes, jobs and scheduling on spreadsheets and email, who need a system built around how their operation actually works and delivered in manageable phases.

FAQs

Frequently asked questions

Can a stalled or unfinished ERP project be completed by a different supplier?

Often, yes. Where the underlying platform and data model are sound, a second supplier can complete unfinished functionality, resolve defects and take the system into production. The first step is an honest assessment of the existing build, since completing a poor foundation costs more than replacing it.

How do you decide whether to fix or rebuild a failed system project?

Assess the data model, the platform choice and the quality of what has been built. If the foundation is sound and the gap is unfinished work rather than fundamental design problems, completion is usually cheaper and faster. If the data model is wrong, rebuilding is generally the better decision even though it feels like a bigger step.

Why do ERP projects stall before going live?

Common causes include requirements that were not fully mapped at the outset, scope that grew during the build, and defects that accumulated faster than they were cleared. Access and permissions problems are a frequent final blocker, because a system that cannot safely be released to staff cannot go into service however complete the rest of it is.

What is role-based access control in Power Platform?

Role-based access control governs what each user can see and do based on their role rather than being set individually. In Power Platform it is configured through security roles applied to Dataverse tables and records. Getting it wrong is one of the more common reasons a system cannot be released.

Should you use Dataverse or SharePoint for a business system?

Use both, for different things. Dataverse is a relational database suited to structured, transactional records — orders, jobs, stock, customers — where relationships between records matter. SharePoint is suited to documents, where version history and file handling matter. Many systems built on Dataverse alone end up needing SharePoint added for the document side.

What licensing is needed for a Power Platform ERP?

An ERP built on Dataverse requires premium Power Apps licensing, either per app or per user. This is not included in standard Microsoft 365 plans. Licensing should be established during scoping, since it is a recurring cost that materially affects the total.

Is Power Platform suitable for small and medium manufacturers?

It is well suited to firms too large for spreadsheets but not large enough to justify a major ERP implementation. Delivering in phases means functionality can go into use in stages rather than requiring a single large switch-over.

How much of a failed system project's cost can be recovered?

It depends entirely on the state of the existing build. Where the platform and data model are sound and the problem is incomplete work, much of the original investment can carry forward. This is worth establishing before committing to a rebuild, since the assessment is inexpensive relative to the cost of starting again.

Brand dot pattern Brand dot pattern Brand dot pattern Brand dot pattern

Looking to achieve similar results?

If a system project has stalled, or you have paid for something that never went live, it is worth finding out what can be salvaged before writing it off.

Practical advice, clear next steps, no obligation